🛠️

Understanding Feature Requests and Development Process

Oct 20, 2024

Lecture on Feature Requests and Bug Reports in Software Development

Introduction

  • Speaker: San, co-author of best-selling system design interview books
  • Focus: Understanding the journey of feature requests and bug reports
  • Aim: Simplify complex system design concepts

Process Overview

  1. User Feedback Gathering

    • Product team collects user feedback and requirements.
  2. Breaking Down Work

    • Product and engineering teams break work into user stories.
    • Developers pick up items during sprint planning.
    • Typical sprint duration: 1-2 weeks
    • Larger projects can span multiple sprints.
  3. Prioritization and Planning

    • Engineering managers/tech leads prioritize tasks.
    • Balance team capacity across sprints.

Development Phase

  • Building

    • Developers start building after sprint planning.
    • Use of RFC or design document for high-level architecture.
  • Source Control

    • Use of Git or similar for source control.
    • Creation of feature branches to isolate work.
    • Database schema changes managed via migration scripts.
  • Code Review and Testing

    • Pull requests for team review.
    • Merged into main branch post comprehensive unit testing.

Continuous Integration and Deployment (CI/CD)

  • Pipeline Activation

    • Merging triggers CI/CD pipeline using tools like GitHub Actions and Jenkins.
  • Environment Validation

    • Features tested across dev, test, and staging environments.
    • Staging mirrors production for consistency.

Quality Assurance (QA)

  • Validation Process
    • QA engineers conduct thorough testing: functionality, regression, security, performance.
    • Some teams use developers for validation.

User Acceptance Testing (UAT) and Release

  • UAT Process

    • Product team, QA, and developers collaborate on validation.
    • Techniques such as canary releases and feature flags used for risk reduction.
  • Production Rollout

    • Use of maintenance windows, read replicas, rollback scripts.
    • Techniques: Multi-phase migrations, feature flags for access control.

Monitoring and Metrics

  • Site Reliability Engineers (SREs)

    • Monitor metrics, logs, and traffic for issues.
    • Bugs prioritized and fixed.
  • Analytics Monitoring

    • Ensure features do not negatively impact key business metrics.

Conclusion

  • Summary: Feature requests journey through design, development, testing, incremental rollout.
  • Promotion: System design newsletter covering broad system design topics.
  • Subscription link: blog.bybygo.com