🌍

Overview of Leapfrog Edge Module

Apr 29, 2025

Lecture on Leapfrog Edge Resource Module

Introduction

  • Speaker: Steve Law, Senior Geologist at Sequent
  • Focus: New Leapfrog Edge Resource Module
  • Background: Vast experience in geology and mining geology

Sequent Ecosystem

  • Leapfrog Geo: Primary tool for mining and mineral sectors
  • Leapfrog Geothermal: Used in the energy market
  • Leapfrog Works: For civil and environmental sectors
  • Leapfrog Edge: Not standalone; module within Leapfrog Geo and Geothermal
  • Sequent Central: Project management system for collaboration
  • Leapfrog Viewer (Leapfrog View): Browser-based project sharing tool

Benefits of Leapfrog Edge

  • Time Efficiency: Intuitive interface, easier updates
  • Integration: Unified platform for resource estimation
  • Visualization: 3D scene integration for data visualization

Workflow and Process

  • Initial Models: Time-consuming but efficient for updates
  • Resource Estimation Steps: Includes geology modeling, data analysis, and estimation
  • Flexibility: Allows backward and forward steps between model and estimation

Demonstration Highlights

  • Leapfrog Central Interface: Project management
  • Model Setup: Drill holes, geological models, and estimation domains
  • Data Analysis Tools: Statistics, visualization, and graphs
  • Variography and Compositing: Tools for data handling

Usage and Applications

  • Early Evaluation and Resource Infill Drilling: Adaptations during drilling
  • Grade Control: Instant updates linked to data and geological models
  • Global Adoption: Usage in standard resource estimation and reports

Estimation Mechanics

  • Domain Estimation Setup: Selection of domains and data
  • Sample Geometry and De-clustering: Tools for data accuracy
  • Estimation Techniques: Inverse distance, kriging, etc.

Validation and Reporting

  • Block Models: Regular and sub-block models
  • Validation Tools: Grade tonnage curves, swath plots
  • Resource Reporting: Use of geological models for accurate reporting

Export and Future Directions

  • Export Options: CSV, DataMine, and future Surface formats
  • Project Management with Central: Dynamic linking and updating for consistency

Conclusion

  • Central as a Dynamic Tool: Especially useful for collaborative and iterative project environments
  • Continuous Improvement: Since its release, Edge has been continuously updated and adopted widely across various regions and sectors.