📊

4 - P 03.03.25 Miro walkthrough next tasks - Meeting Notes on Power BI UX Improvements

Apr 3, 2025

Lecture Notes

Introduction and Context

  • Discussed the use of an A-frame as a vacation home, mentioning its size and comfort.
  • Conversation centered around whether SciCat needed to be involved in discussions about UI changes for external templates.
  • Consensus: SciCat doesn't need to be involved in a call regarding UI/UX design changes.

Purpose of the Meeting

  • The meeting was organized to discuss updates following an initial call a week prior.
  • Chris was to provide updates on reporting, feedback, and best practices.
  • A draft document was shared to align everyone on Power BI best practices.

Document and Feedback

  • Chris had prepared a document with initial draft components for Power BI.
  • Document includes guidelines on:
    • Language simplicity and clarity
    • Consistent terminology
    • Actionable insights, labeling, and user guidance
    • Layout and design guidelines (structure, typography, color contrast, etc.)
  • The document will be a living document, open for additions and updates.

Power BI UX Considerations

  • Performance optimization and mobile/cross-device compatibility were discussed.
  • Accessibility considerations, including alternative text for visuals.

Design and UI Best Practices

  • Emphasis on the importance of descriptive chart titles and consistent capitalization practices.
  • Discussion on color coding and alt text for accessibility.
  • Suggestions for improvements in padding, font sizes, and layout to enhance user interface.

Chart and Visual Elements

  • Chris provided feedback and suggestions on specific chart elements:
    • Improving chart title descriptiveness.
    • Adjusting colors for better visibility and compliance with contrast standards.
    • Discussed the handling of currency display and possible automation based on localization.
    • Consideration of automatic currency conversion.

Quick Wins and Future Improvements

  • Identified "quick wins" for immediate implementation:
    • Adding alt texts as a practice for accessibility.
    • Using smart narrative for summarizing findings.
  • Challenges in implementing detailed UI changes due to time constraints.

Follow-up Actions

  • Need to schedule another meeting to go over unresolved questions.
  • Chris to share the Power BI document and Miro board for further feedback.
  • Discussion on the best practices document's integration with existing training materials.

Conclusion

  • Agreement to continue discussions and iterate on improvements.
  • Feedback will be reviewed and implemented in future releases.
  • Emphasis on incremental improvements and integrating suggestions into the release cycle.