🚀

Skyroot Aerospace Factory Tour

Jul 22, 2024

Lecture Notes: Skyroot Aerospace Factory Tour

Introduction

  • Speaker visited Skyroot Aerospace for a factory tour.
  • Skyroot Aerospace, an Indian private space startup founded by Pawan and Bharat in 2018, both ex-ISRO.
  • Currently working on Vikram 1, an orbital class rocket with four stages (three solid, one liquid).
  • Previous suborbital test with Vikram S (VKS).

Rocket Design

Vikram 1 Design Features

  • Height: 22 meters, equivalent to a 7-story building.
  • Stages:
    • Stage 1, Stage 2, and Stage 3: Solid motors.
    • Stage 4: Liquid stage.
  • Structural: Highly composite structure, very lightweight, uses carbon fiber throughout.
  • Challenges: Separation Systems
    • Horizontal and vertical separation needing rigorous testing and good design.
  • Changes in Design
    • Transition from conical to cylindrical shape for better center of pressure and control.
    • Adjustments in nozzle angle for controlling the rocket.

Specific Parts and Systems

Fairing

  • Design Complexity: Involves both horizontal and vertical separation.
  • Seal and Venting: Needs to maintain a clean environment for the satellite and release pressure gradually.

Flex Seal and Nozzle

  • Used for thrust vector control (TVC).
  • Composed of layers of rubber and metal, allowing the nozzle to flex and steer the rocket.
  • High-pressure tests to ensure survival under operational conditions.

Inter-Stage

  • Houses roll control systems and thrusters.
  • Modular design to separate and reconnect various sections.
  • Complex wiring and plumbing for control systems, ensuring no collision during separation.
  • Pneumatic separation mechanisms over pyros for reliability.

Actuation System

  • Uses two actuators positioned at 90 degrees for pitch and yaw control.
  • Mirror imaging sensors to mirror actuator movements and manage flex seal pressures.

Manufacturing and Testing

Composite Manufacturing

  • Filament Winding: Uses a 4-axis robot to achieve directional strength in carbon fiber components.
  • Tooling: Each stage requires specific tooling; complexity increases with size.
  • Prototyping: Initial stages tested with smaller models, scaling up step-by-step.
  • Challenges: Ensuring no-slip during winding, managing manufacturing precision, and lightweight structures.
  • Integration: Complex assembly processes for aligning large components.

Testing Protocols

  • Pressure Testing: Extensive pressure tests to verify structural integrity and performance.
  • Static Fire Tests: Scheduled static fire tests for various stages, particularly new designs like Kalam 250 (second stage, 250 kN thrust).
  • Separation Tests: Testing separation dynamics and mechanisms, including fairing separation.

Engineering Challenges

  • Real-time simulations for aerodynamic and thermal aspects.
  • Ensuring dynamic control during all phases of flight.
  • Handling residual thrust in solid motors and using retro motors for immediate stage separation.

Future Plans and Innovations

  • Payload Capacity: Expected to exceed 400 kg to low inclination orbits.
  • Optimization: Continuous design refinements based on early flight data.
  • New Technologies: Exploring liner-less cryogenic tanks and advanced manufacturing methods.
  • Central Thruster for Upper Stages: Using 3D-printed engines with regenerative cooling for improved control.
  • Wind Tunnel Testing: Validated aerodynamics for accurate coefficient measurements.

Closing Remarks

  • Speaker's personal experience: Spent 4 hours on the tour, learned a lot about rocket manufacturing and engineering challenges.
  • Highlighted the growth of Indian private space startups and their advancements.

Note: The speaker acknowledged financial supporters for making the tour and video possible.