Transcript for:
Mini Training Course on Plant Commissioning

[Music] hello everybody here's thas stuner founder of commissioningcoach.com a commissioning manager and the commissioning engineer welcome to part one of my 10 parts commissioning video mini training course for commissioning newbies in this course I want to give you an overview about about the nine key elements for successful plant commissioning it doesn't matter if you want to commission a petrochemical plant a Refinery a power station or water treatment plant the nine key elements are the same everywhere in this first lesson you will learn to name the nine key elements and you will learn the right order of the nine key elements I choose the the mindmap format for my presentation because it's easier to remember and of course you can download these mindmap in HD quality from my download section on www.c commissioningcoach.com so let's start with key element number one you guess yes the first key element is planning without proper planning you will not be able to commission a plant safely and in time second key element is MC or mechanical completion this is a time when the commissioning team takes over the systems from the construction team the third key element is at the same time the first big task in the field for the commissioning team it's a p& ID check the commissioning Engineers will verify that everything in the field is built according to the specifications pre-commissioning is a force key element it includes cleaning of pipes by blowing and flushing mechanical cleaning of vessels and tanks no Lo test runs of motors and much much more the fifth key element is commissioning this step includes for example introduction of utilities dry running trials hot running trials safe fluid Dynamic testing solvent Dynamic testing and process fluid tests now we will face a lot of problems to be solved before key element number six startup this means the entire plant will be taken slowly to full operation and now we are coming to the initial operation this phase is necessary to prepare the performance test during the initial operation the entire plant will be optimized key element number eight the performance test is a big moment for the whole commissioning team now we have to prove that the plant meets all specifications under normal operating conditions during the post commissioning phase A reduced commissioning stuff will take care and self openen punch points don't underestimate the time necessary for post commissioning activities I want to remind you that you can download these mind map in HD quality from my download section on www.c commissioningcoach.com I summarize the first lesson we learned to name the nine key elements of successful plan commissioning and we learned the right order of it in lesson number two I will speak about the first key element planning in more more detail so please sign up for my commissioningcoach.com newsletter and I will keep you up to dat about new training lessons thank you for watching and see you soon [Music]