Sydney Metro West Syd Airport Project Tour
Introduction
Speaker: Roberto, Tunnel Manager for Southern Tunnels
Project: Sydney Metro West Syd Airport
Purpose: Introduce the world of tunnel boring machines and their role in new metro tunnels construction
Overview of Metro Line Construction
Contractor: CPB Contractors Ghella
Scope: Excavation of five station boxes, two service shafts, and two TBM tunnels
Route: From St. Marys to Aerotropolis
Safety Measures:
Daily site inductions
Review of safety documents
Daily site work and observations
Equipment checks
Infrastructure and Operations
Speaker: Matthew, Engineer at Airport Business Park
Segment Yard:
Location where tunnel segments are stored
Segments produced in Brisbane, shipped to site
Stored until installation in tunnels
Segment Installation:
Transported from segment yard to gantry crane area
Lifted into airport dive for tunnel boring
Construction Details
Airport Dive:
Transition from surface to underground
Excavation: 192,000 tons of rock (equivalent to 30 Olympic swimming pools)
Structure dimensions: 12m deep, 300m long, 25m wide
12,000 tons of concrete used
Services:
Supply to tunnel boring machines: water, grout, sodium silicate
Includes conveyor and ventilation systems
Tunnel Transport Vehicle (TSP):
Delivers segments to TBM
Cross Passages:
Located every 240m between two tunnels
Tunnel Boring Machines (TBM)
TBM Ile:
First TBM launched at the Airport Business Park site
TBM Peggy:
Second TBM to launch for the project
Tunnel Conveyor System
Static Conveyor:
Part of tunnel conveyor system
Transports excavated material to the surface
Conclusion
Tour Objective: Provide insight into tunnel construction
Encouragement to explore the tunnel world
📄