Sydney Metro West Airport Project Overview

Mar 21, 2025

Sydney Metro West Syd Airport Project Tour

Introduction

  • Speaker: Roberto, Tunnel Manager for Southern Tunnels
  • Project: Sydney Metro West Syd Airport
  • Purpose: Introduce the world of tunnel boring machines and their role in new metro tunnels construction

Overview of Metro Line Construction

  • Contractor: CPB Contractors Ghella
  • Scope: Excavation of five station boxes, two service shafts, and two TBM tunnels
  • Route: From St. Marys to Aerotropolis
  • Safety Measures:
    • Daily site inductions
    • Review of safety documents
    • Daily site work and observations
    • Equipment checks

Infrastructure and Operations

  • Speaker: Matthew, Engineer at Airport Business Park
  • Segment Yard:
    • Location where tunnel segments are stored
    • Segments produced in Brisbane, shipped to site
    • Stored until installation in tunnels
  • Segment Installation:
    • Transported from segment yard to gantry crane area
    • Lifted into airport dive for tunnel boring

Construction Details

  • Airport Dive:
    • Transition from surface to underground
    • Excavation: 192,000 tons of rock (equivalent to 30 Olympic swimming pools)
    • Structure dimensions: 12m deep, 300m long, 25m wide
    • 12,000 tons of concrete used
  • Services:
    • Supply to tunnel boring machines: water, grout, sodium silicate
    • Includes conveyor and ventilation systems
  • Tunnel Transport Vehicle (TSP):
    • Delivers segments to TBM
  • Cross Passages:
    • Located every 240m between two tunnels

Tunnel Boring Machines (TBM)

  • TBM Ile:
    • First TBM launched at the Airport Business Park site
  • TBM Peggy:
    • Second TBM to launch for the project

Tunnel Conveyor System

  • Static Conveyor:
    • Part of tunnel conveyor system
    • Transports excavated material to the surface

Conclusion

  • Tour Objective: Provide insight into tunnel construction
  • Encouragement to explore the tunnel world